At 10:00 on June 19, after a full day and night rescue, flash floods washed away the roadbed was interrupted 3 days of Iasi highway Yihai segment is open. After 2 hours, 108 State Road Yihaixiang Lepa segment also is open. Thus, within the two main roads Mianning fully restored vehicles.
High-speed flash floods landslides Iasi crown Ning Zhiyi way across the sea off the road segment, more than 4000 stranded vehicles. "3 days, including more than 40 members, including commando teams have worked continuously for more than 100 construction, investment of 30 heavy construction machinery and transportation vehicles." Iasi Area's high-speed Ya climbing disaster relief commander, surprise party Captain Wang Jian said: "The off road a total of 40000 cubic meters of landfill debris, the current recovery is the prevailing one-way temporary pavement, widening the road we are full, and strive to achieve two-way traffic the afternoon." truck drivers to drive the master Cen by off road at the time, came to the rescue personnel horn salute. Cen master said: "I did not expect so soon is open, and rescue personnel amazing!"
At the same time, the 108 State Road Yihaixiang Lepa section, a traffic police directing cars off the road through the place orderly. Provincial highway at the scene, the official told reporters, after three days of uninterrupted repair, 108 State Road Yihaixiang Lepa off Road Department has resumed at 18:00 on the 18th, small vehicles can pass the night and rescue teams pay close attention to the ancient village of Cao pull pull sheep sheep village three dangerous bridge reinforcement, 19, 8 pm, 108 State Road, across the board to restore access within Mianning.
19, after the rescue and relief personnel for 13th, Mianning power has been restored, disaster communication base station 12 has returned to power, fiber-optic cables all connected, mobile, telecommunications back to normal. Source: Sichuan Daily