Reporters today (21) days from the Sichuan authorities informed that due to the rain last night, at 8:30 on July 21 about the territory of Wenchuan County, State Road 213 k886 +500 (completely off the tunnel and the tunnel between the dam Futang) landslides of about 2000 cubic meters.
Currently, the Wenchuan highway transportation department machinery, has reached the scene, due to continued emission of debris flow, on-site emergency conditions are very poor, in order to ensure safety of personnel and machinery, and then deal with emergencies when conditions permit.
In addition, due to heavy rain last night, leading to State Highway 213 and ginkgo Township Shaping peach off section off landslides, mudslides side Shaping off about 2000 cubic meters of peach square off about 1200 cubic meters of debris flow, resulting in road traffic disruption. After the disaster, Wenchuan highway department immediately organized transport machinery, rescue personnel rushed to the scene.
Reporters today (21) days from the Sichuan authorities also learned, g76 Chengdu, Xiamen-Chengdu Expressway to Neijiang segment, direction: 2175.5 km at all within the Jiang Zhicheng, due to traffic accidents in at 9:30 on July 21, 2011 began the road closed. Meanwhile, both high-speed direction Timor: two-way, across the board, due to landslides in at 1:24 on July 21, 2011 began the road closed. Source: Sichuan News Network