Repair road accident
Heavy rain hit Sichuan
Within six railway Zhaotong Hengjiang to children within range of a railway bridge floor was torrential rain and flood damage is expected to reopen tomorrow
Circuitous run passenger trains, including:
Chengdu east to Guangzhou East k829 / 8 times k827/30 times
Chengdu to Kunming k853 / 4 times
Chongqing to Kunming k1052/49 times k1050 / 1 times
Chengdu to Kunming k1139/40 times
Chengdu to Guangzhou East k1223 / 2 times k1221 / 4 times
Chengdu to Hangzhou k1273 / 2 times k1271 / 4 times
East to Chengdu, Guiyang k9465 / 4 times k9463 / 6 times
Chongqing to Zhaotong k9402 / 3 times k9404 / 1 adjustment segment runs from Chongqing to Yibin.
Within six Railway (Neijiang to Liupanshui) south of the River from one of the important channels, to children in Sichuan-Yunnan border Yokoe Ping interval within six sections of the railway is the only way. The sections of difficult terrain, is the top priority within the six railway, is the only industry in Yunnan, Sichuan Road, off the line to grab cross-section of channel iron dry.
At sub-1800 Neijiang
Is ready to go off rail
Last night, because within six Railway (Neijiang - Liupanshui) cut off the railway in Yunnan and Chengdu to Hangzhou k1273 times, Chengdu, Guangzhou East k829 east to 14 times a second-class passenger train travel ten thousand passengers were affected.
July 27 is the cause, within the six railway Zhaotong Hengjiang to children within range of a railway bridge floor was torrential rain and flood damage.
The direction of southern Sichuan and Guizhou, stranded thousands of passengers yesterday morning after another transfer has completed. And destroyed 30 railway bridge is expected to be reopened.
Neijiang railway authorities to remind: the passengers concerned about the station announcements at any time, adjust the travel arrangements.
Thousands of transit passengers
Yesterday afternoon, the train station in Station Square Neijiang the led screen on the release announcement: From Kunming, Hangzhou, Guangzhou, Guiyang Neijiang four places through the train bound for Chengdu late, arrival time is still not sure.
It is expected, zero this morning, after four to six times the train will be bound for another station in Chengdu, there will be more than 1800 transit passengers from Neijiang to Yibin, Zigong.
Previously, Neijiang has transported thousands of people. To 4:00 am yesterday, Neijiang Operations Section 1205 of stranded passengers were blocked transport people, 5724 people refunds.
Diverted to Chengdu Sichuan, Guizhou
It is reported, where the original railway running through within six passenger trains diverted via Chengdu, Sichuan-Guizhou railway roundabout operation. To run passenger trains including the roundabout, east of Chengdu, Guangzhou East k829 / 8, k827/30 times from Chengdu to Kunming k853 / 4 times, from Chongqing to Kunming k1052/49, k1050 / 1 second, the Chengdu-Kunming k1139/40 times, Chengdu to Guangzhou East k1223 / 2, k1221 / 4 times, Chengdu to Hangzhou k1273 / 2, k1271 / 4 times, east to Guiyang, Chengdu k9465 / 4, k9463 / 6 times. Meanwhile, Chongqing to Zhaotong k9402 / 3, k9404 / 1 adjustment segment runs from Chongqing to Yibin.
Reopened waiting for tomorrow
According to reports, within six Railway (Neijiang to Liupanshui) south of the River from one of the important channels, to children in Sichuan-Yunnan border Yokoe Ping interval within the six sections of the railway is the only way. The sections of difficult terrain, is a top priority within the six railway is the only railway junction of Sichuan and Yunnan.
Chengdu Railway Bureau Operations Section Neijiang Party branch secretary, said Du Bin, has launched the emergency plan, water damage destroyed the railway bridge was being stepped up repair damaged railway bridge is expected around July 30 in order to restore traffic.
"We're really back luck, and is ready to go on the broken rail." Yibin station Miss Yu told reporters. It is understood that Ms. Yu to her parents in Yibin Wang Town, a week ago, her son with first grade relatives back Yibin.
28, Yu is with his son three with her aunt and her daughter went to Hangzhou. Who knows, in front of the railway to the train station was told off, only to vote drained away.
Ms. Yu told reporters that the case of such incidents, they also understand the railway sector. "We're going back to her parents and then a few days the railway was open again after longer follow." Ms. Yu said.
Yibin Zhang, who lives in the 28 scheduled to Zhaotong. 27 pm, Yibin to implement outage Zhaotong railway. This news is very depressing Mr. Zhang, 28, early in the morning, he returned the train, while looking for the "go the same way those who" take the car to Zhaotong. "It's so depressing, and this whole incident to upset my plans." Zhang said.
Trinidad Connection
Boulders washed down storm hit the railway bridge
4 pm yesterday, reporters thousands of miles to connect Chengdu Railway Bureau Liupanshui party studio director of the Public Works section of Pan-chiu. He said on the phone, due to heavy rains, the mountain Beng Tan, a large piece of rock collapsed down, hit a six-lane 165 km within 118 meters Yokoe 2, the first bridge beam hole, then rolled directly into the Hengjiang.
As the need to replace the damaged beam, the temporary closure of the railway construction, traffic disruption is expected on July 30 has been replaced.
In this emergency, the Chengdu Railway Bureau organized nearly 300 personnel involved in repair, the present tense of the repair work is in order. Source: WCC